Thursday, November 12, 2009
An Elkhorn Walk Interrupted
From CA:
On Friday, November 13, a section of path will be closed from 7 to 11 a.m. The pedestrian bridge below the dam (near Broken Land Parkway) will be closed, as will the path north of the pavilion on the east side of the lake. This means that there is no way for pedestriations [pedestrians?] to complete the circuit on the pathway at Lake Elkhorn during that time. Signs will be posted indicating "Temporary Path Closure" and "DO NOT ENTER" on the path approaching the closed area. If the weather prohibits the scheduled construction activity to occur on Friday, the path closure will occur on Monday, November 16, from 7 to 11 a.m.
On Friday, November 13, a section of path will be closed from 7 to 11 a.m. The pedestrian bridge below the dam (near Broken Land Parkway) will be closed, as will the path north of the pavilion on the east side of the lake. This means that there is no way for pedestriations [pedestrians?] to complete the circuit on the pathway at Lake Elkhorn during that time. Signs will be posted indicating "Temporary Path Closure" and "DO NOT ENTER" on the path approaching the closed area. If the weather prohibits the scheduled construction activity to occur on Friday, the path closure will occur on Monday, November 16, from 7 to 11 a.m.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment